Commercial Water Restoration After Sewer Backup Affected Half the Unit
Steamy Concepts responded to a commercial water damage project in Tucson, AZ after a sewer backup affected approximately half of the unit.
The team performed dryout, sanitization, and demolition in the affected areas, completed a full disinfectant wipe-down, and removed all contaminated materials. All services were completed in five days.
Dryout, sanitization, demolition of affected areas, full disinfectant wipe-down, and removal of contaminated materials.
Addressing a sewer backup that affected approximately half of the commercial unit.
Steamy Concepts completed all services in five days.
Problem
A sewer backup affected approximately half of a commercial unit in Tucson, AZ.
The impacted zones needed drying out, thorough sanitization, demolition, disinfection, and the disposal of any contaminated materials.
The property needed a coordinated response that addressed both the water damage and the contaminated materials throughout the affected portion of the unit.
Solution
Steamy Concepts completed the documented commercial water restoration services throughout the affected areas.
The team performed dryout, sanitization, and demolition, completed a full wipe-down of the affected areas with disinfectant, and removed all contaminated materials.
All documented services were completed within five days.
Our Process
Steamy Concepts reviewed the commercial property after a sewer backup affected approximately half of the unit. The project was organized around dryout, sanitization, demolition, disinfection, and contaminated-material removal.
The team performed dryout services in the portions of the commercial unit affected by the sewer backup.
Steamy Concepts sanitized the affected areas as part of the documented commercial water restoration scope.
The team demolished the materials included within the affected areas of the commercial unit.
Steamy Concepts performed a full wipe-down of the affected areas using disinfectant.
The team removed all contaminated materials included within the documented project scope.
Steamy Concepts completed the documented dryout, sanitization, demolition, disinfectant wipe-down, and contaminated-material removal services in five days.
Our Team
Chris Lynch
Project ManagerRole: Project Manager
Project: Commercial sewer backup restoration in Tucson, AZ
Chris Lynch served as the project manager for the commercial sewer backup restoration project in Tucson, AZ.
John
Project TeamRole: Project Team
Project: Commercial sewer backup restoration in Tucson, AZ
John was part of the Steamy Concepts team that completed the commercial sewer backup restoration project in Tucson, AZ.
Jaime
Project TeamRole: Project Team
Project: Commercial sewer backup restoration in Tucson, AZ
Jaime was part of the Steamy Concepts team that completed the commercial sewer backup restoration project in Tucson, AZ.
Rudy
Project TeamRole: Project Team
Project: Commercial sewer backup restoration in Tucson, AZ
Rudy was part of the Steamy Concepts team that completed the commercial sewer backup restoration project in Tucson, AZ.
Elton
Project TeamRole: Project Team
Project: Commercial sewer backup restoration in Tucson, AZ
Elton was part of the Steamy Concepts team that completed the commercial sewer backup restoration project in Tucson, AZ.
Results
Steamy Concepts completed a commercial water restoration project in Tucson, AZ after a sewer backup affected approximately half of the unit.
The documented scope included dryout, sanitization, demolition of the affected areas, a full disinfectant wipe-down, and removal of all contaminated materials.
All services were completed in five days.
Project Completion
Days to Complete All Services
Steamy Concepts completed the full documented commercial restoration scope within five days.